 |
|
|
|
|
|
 |
|
|
|
Exhibitions
Studio to Public
Shelter and Sustainability
One Person Show
May 13th-July 1st
Everett ArtWalk June 21st 4-7pm
Greening Properties
217 Rucker Ave Everett, WA
|
|
|
|
|
Over the Edge
Collective Works
July 5th-30th
Opening July 11th 6-9 pm
Issaquah Art Walk
UpFront Gallery
48 Front St. N, Issaquah, WA
|
|
|
Art Outside
Group show
opening June 21st
Port Angeles
Fine Arts Center
Port Angeles, WA
360 - 417 - 4590
|
|
|
|
|
|
| Public Art |
|
 |
Seattle Housing Authority
History Bench
Doubling as a tree support, this bench is designed from cedar, Boeing and Duwamish Shipyard scrap reflective of the site history.
|
|
|
 |
Greenbridge Early Learning Center
Contract with Puget Sound Educational Services District; 1% funded by Gates Foundation. Design and install Public art at the new Early Learning Center.
|
|
|
|
 |
|
Seattle Housing Authority
Water feature
Early Design phase. Built into the plaza of a mixed use building at Rainier Vista
|
|
|
|
Squire Park Pea Patch
Design artwork to incorporate into the fence enclosure of a community pea patch. The artwork is inspired by the jazz history of the community known as Jackson Street.
|
|
|
|
 |
|
|
|
 |
A1Landscaping
The Red Liine
Fabrication contract -linear trail of glass cullet, and other inlay to create a red trail tying together labyrinth imagery at the site.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|